 Here is my To Do list!!  It is huge!!  LOL!!  In the Living room area there are two couches that pull out into beds.  If you are familar with an RV you know this is a common place for fresh water tanks.  There was nothing under the couches.  I found a RV junkyard in Sacramento www.rvdoctor.com and purchased two 47 gallon tanks.  I need to finish the plumbing but if I utilize the tank that was existing we will have about 150 gallons of fresh water!!  I am going to install a seperate water pump just for the head that draws river water to flush.  In the delta here you are not required to hold grey water.  So our shower, and sinks will dump to the river.  I am thinking of installing a small grey water tank so we can hold the water until we are in an are where we feel comfortable dumping.  Of course the sewage has it's own tank and will have to be pumped out occasionally.

Electrical
1 Remove old Generator
2 Install new ends on all battery cables and update
3 Repair control wiring on engines (needs wraped taped)
4 Redo insulation on main wiring from below deck to batteries
5 Cut deck and install battery box
6 Make battery box
7 ID where additional lights go and wire for them
8 Wiring for pump for head
9 Wiring for Nav lights
10 Wiring for speakers ID where speakers should go
11 Wiring for lights on top deck (rope lites??)

Plumbing
1 Install new water tanks
2 Connect water tanks to pump
3 Install pump for head
4 Check all plumbing fixtures
5 Remove old water heater
6 Install new water heater
7 Install accumalator at pump
8 Install second water pump for back up

Propane
1 Install Propane tank
2 Install Cook Stove
3 Test all gas lines for leaks
4 Hook up heaters and check
5 Install aux line for BBQ
6
Engines
1 Drain old fuel and freshen with new fuel
2 Check Compression Done
3 Try to start engines Done
4 Remove Calcium from bottom units
5 Repair seals in bottom units
6
Misc
1 Remove steering ram and repair seals
2 Fill steering system with oil and test

Hull
Sandblast and prime all rusted areas
Pressure check pontoon compartments DONE
Weld up steps on rear
Build swim platform on rear
Sandblast and paint pontoons

Living area
Pressure wash and paint exterior
R/R Windows Removed now have to replace!!
Repair replace paneling About 90% Done
Paint Bathroom
Install Kitchen stove
Install Fridge
Repair Kitchen Cabinets New doors made
Install Cabinet doors under couch
Install bed and bunk beds in rear bedroom
Repair cushions for bunk beds