
And you can also see the rub rail on the side of the boat. It is Trex deck material, really cleaned up the dented side of the boat!!
And we installed the swim platform that Larry Kost built for us!! It still needs to have the rest of the bolts and the Trex decking put on.
I didn't take pictures of it, but Linda made the pattern and cut and installed the carpet in for the back of the boat. She also painted the bed frames and has them at the boat ready for me to install. We need to finish the coal tar painting in the next couple of days so it can cure prior to it going in the water on the 24th!




0 comments:
Post a Comment